Metal Panel Curtainwall
Installation & Design Considerations
Locate insulation horizontally between wall ties directly on back-up wall.
Provide 1” minimum clear space between inside brick face and the exterior surface of the insulation board.
Abut foam insulation board joints tightly. Cut insulation to fit tightly around vents, louvers, pipes, conduits and other through-wall/insulation penetrations.
Joints and openings should be sealed with Owens Corning BILD-R-TAPE®.
Provide adequate flashings, functioning weepholes and caulk movement joints.
The need for and placement of vapor retarders should be determined by the building designer.
Architect must supply detailed drawings to meet project and building code requirements.
Product Options
FIBERGLAS™ 700 Series Insulation
Curtainwall Insulation / CW225