Skip to Content
Home
Foam
MBI
Air Handling Systems
Pipe & Equipment
OEM
Search:
Only Commercial Insulation
All Owens Corning Sites
Applications Overview
Products
Literature
News & Resources
Contact Us
Brick and Metal Frame Wall
Installation & Design Considerations
Maintain minimum 1” air space or other capillary break between masonry and insulation. Use weep holes at flashing locations to vent moisture build-up in the wall cavity.
Maintain air space between sheathing and brick.
The need for and placement of vapor retarders should be determined by the building designer.
Minimize penetrations of insulation by structural elements, wall attachment devices, etc. In constructions using a vapor retarder, careful consideration should be given to maintaining vapor retarder integrity.
When specifying kraft-faced or standard foil-faced insulation, check local code requirements for limitations and install facing in substantial contact with finish surface.
Architect must supply detailed drawings to meet project and building code requirements.
Product Options
Flame Spread 25 FIBERGLAS™ Insulation
Thermal Batt FIBERGLAS™ Insulation