Brick and Metal Frame Wall

Installation & Design Considerations

  • Maintain minimum 1” air space or other capillary break between masonry and insulation. Use weep holes at flashing locations to vent moisture build-up in the wall cavity.
  • Maintain air space between sheathing and brick.
  • The need for and placement of vapor retarders should be determined by the building designer.
  • Minimize penetrations of insulation by structural elements, wall attachment devices, etc. In constructions using a vapor retarder, careful consideration should be given to maintaining vapor retarder integrity.
  • When specifying kraft-faced or standard foil-faced insulation, check local code requirements for limitations and install facing in substantial contact with finish surface.
  • Architect must supply detailed drawings to meet project and building code requirements.