Installation & Design Considerations
Evaluate climate and building interior conditions to determine the amount of roof deck insulation needed to control surface condensation on bar joists.
Wire-up installation: Utilize 16 or 18 gauge line wire run diagonally or perpendicular to insulation every 18 to 24 inches.
Impaling pin installation: Utilize impaling pins welded to the roof deck or fastened to the deck with adhesive. Impale insulation on anchor and secure with washer.
The minimum number of impaling pins needed are shown in the diagrams below. Pins should be placed 3”-8” from the edge(s) of the product.
Product Options
FIBERGLAS™ 700 Series Insulation