Skip to Content
Home
Foam
MBI
Air Handling Systems
Pipe & Equipment
OEM
Search:
Only Commercial Insulation
All Owens Corning Sites
Applications Overview
Products
Literature
News & Resources
Contact Us
BUR Modified Bitumen / Steel Deck
Installation & Design Considerations
Protective layer or gravel, slag or white marble chips applied in surface bitumen.
BUR, torch applied or self adhering modified bitumen membrane must be applied over a cover board.
A cover board must be adhered or mechanically attached over the polystyrene roof insulation.
Cover board joints should be taped to prevent hot bitumen from seeping through to the insulation.
When adhering layers of insulation or the cover board with hot asphalt, the bitumen must cool to 225-250°F before application.
The need for and placement of vapor retarders should be determined by the building designer.
Alternate deck materials; all FOAMULAR® roof insulation can be installed directly on concrete, gypsum, wood and Tectum decks.
See Underwriters Laboratories or Factory Mutual listings for complete details.